Bennettsville-Latta #2 69kV Rebuild
Overview
Santee Cooper plans transmission upgrades to the system to maintain and improve reliability, support load growth, and provide resiliency. A Bennettsville – Latta #2 69 kV line is necessary to provide transmission support to the load growth in MPD Electric Cooperative’s area. This project involves rebuilding an older 69 kV transmission line in existing right of way and building a new 69 kV transmission line as double circuits with modern steel poles in new right of way.
Project Description
Santee Cooper plans to construct a Bennettsville – Latta #2 69 kV line by rebuilding approximately 17 miles of the existing Bennettsville – Latta #1 69 kV line as double circuits, starting in early 2026. There are three MPD Electric Cooperative substations served from the existing Bennettsville – Latta #1 69 kV line. There are currently no planned service disruptions.
Right of Way/Land Acquisition
An additional 30 feet of right of way will be required in areas where double circuits will be installed. The land acquisition process has already begun, and landowners in the affected area have been notified of the project.
Timeline
2024-2025: Studies, planning and engineering. Receive materials.
2026: Begin construction.
2027: The new line is expected to be in service by Dec. 1, 2027.
Traffic
We do not expect any significant traffic delays at this point.
Questions
Please contact the Project Manager Jim Jeffers at 843-761-8000 ext. 4825 or email us at transmissionprojects@santeecooper.com.